LATEST OPERATIONS IN BULGARIA.
06-12-2011
Nobinter EOOD finalised the sale of 4.5 Mw in Bulgaria with the company Astroenergy Bulgaria EOOD, a subsidiary of Grupo Chint. With this operation, Nobesol finalises a long stage in this country where a total of eight projects have been developed, including the Botevo solar plant with con 2 Mwp, Kukorevo with 1.7 Mwp, etc.
This is a total of 20 Mwp if each of the projects undertaken throughout the last three years in Bulgaria are added together, and with which Nobesol is particularly satisfied with the results obtained.

back

Copyright © 2008-2018, Nobesol Levante.

Castellano|Contact us|Legal