KUKOREVO II, CONNECTED!
24-03-2012
Nobinter EOOD connects the Kukorevo 2 solar park, with installed power of 1.7 Mw, to the Bulgarian network. The park has 7,234 LDK modules and three 500 Kw SMA inverters. The fastening structure is made of aluminium and is fixed. The park has the latest technology in monitoring and safety systems, enabling the Nobinter maintenance team to have absolute control over the solar park.
back

Copyright © 2008-2017, Nobesol Levante.

Castellano|Contact us|Legal